▍Testing standards for energy storage battery certification in each region
Certification for EESS battery |
||||
Country/ region |
Certification |
Standard |
Certification Target |
Mandatory |
Europe |
CE certification |
New battery directive(EU)2023/1542 |
All batteries |
Yes |
EMC |
Energy storage system/battery pack |
Yes |
||
ROHS |
Energy storage system/battery pack |
Yes |
||
LVD |
Energy storage system |
Yes |
||
TUV mark |
VDE-AR-E 2510-50 |
Energy storage system |
NO |
|
America |
cTUVus |
UL 1973 |
Energy storage system/cell |
NO |
UL 9540A |
Energy storage system/module/cell |
NO |
||
UL 9540 |
Energy storage system |
NO |
||
China |
CGC Certification |
GB/T 36276 |
Lihium battery cluster/module/cell |
NO |
/ |
GB 44240 |
Lithium battery/battery pack |
NO |
|
/ |
GB/T 44265 |
Sodium battery/battery pack |
NO |
|
CQC Certification |
GB/T 36276 |
Lihium battery cluster/module/cell |
NO |
|
IEC EE |
CB Certification |
IEC 63056 |
Secondary lithium battery and cell for use in electrical energy storage systems |
NO |
IEC 62619 |
Secondary lithium cell/battery system for industrial use |
NO |
||
IEC 62620 |
NO |
|||
IEC 62477-1 |
Energy storage system with power converter (inverter or converter) |
NO |
||
Japan |
S-Mark |
JIS C 8715-2: 2024 |
Cell, battery pack, battery system |
NO |
Korea |
KC |
KC 62619: 2022 |
Cell/ battery system |
Yes |
Australia |
CEC Listing |
-- |
Household lithium battery energy storage system without converter (BS), lithium battery energy storage system with converter (BESS) |
Yes |
Russia |
Gost-R |
Applicable IEC standards |
Batteries |
Yes |
Taiwan |
BSMI |
CNS 62619 CNS 63056 |
Cell/ battery pack |
Yes |
India |
BIS |
IS 16270:2023 |
PVS cell and battery |
Yes |
IS 16046 (Part 2):2018 |
EESS cell < 500wh |
Yes |
||
IS 13252 (part 1): 2010 |
Power bank |
Yes |
||
IS 16242 (Part 1):2014 |
UPS functional product |
Yes |
||
IS 14286: 2010 |
Crystalline silicon photovoltaic modules for ground use |
Yes |
||
IS 16077: 2013 |
Thin film photovoltaic modules for ground use |
Yes |
||
IS 16221 (Part 2):2015 |
Photovoltaic system inverter |
Yes |
||
IS/IEC 61730 (part2): 2004 |
Photovoltaic module |
Yes |
||
Malaysia |
SIRIM |
Applicable international standard |
Energy storage system products |
NO |
Israel |
SII |
Applicable international standard mentioned in regulation |
Household photovoltaic energy storage System (Grid-connected) |
Yes |
Brazil |
IMMETRO |
Applicable international standard mentioned in regulation |
PV Energy storage inverter (off-grid/grid-connected/hybrid) |
Yes |
IEC 62619 or ABNT NBR 16976 |
PV battery |
Yes |
||
Transportation |
Transportation test and certificate |
UN38.3/DGR/IMDG code/ADR/RID/JT/T 617 series |
Storage cabinet/Containe |
Yes |
▍Brief introduction to certification of energy storage battery
♦ CB Certification—IEC 62619
● Introduction
▷ CB certification is an international certification created by IECEE. Its goal is “One test, multiple applications”. The aim is to achieve mutual recognition of product safety test results from laboratories and certification bodies within the scheme worldwide, so as to facilitate international trade.
● The advantages of obtaining CB certificate and report are as follows:
▷ Used for certificate transfer (e.g. KC certificate).
▷ Meet the requirements of IEC 62619 for battery system certification in other countries or regions (e.g. CEC in Australia).
▷ Meet the requirements of end product (forklift) certification.
● Scope
▷ Lithium battery for mobile equipment: Forklift, golf cart, AGV, railway, ship;
▷ Lithium battery for fixed equipment: Uninterruptible power supply (UPS), energy storage equipment, emergency power supply.
● Sample size and lead time
Product |
Sample quantity |
Lead time |
Cell |
Prismatic: 26pcs Cylindrical: 23pcs |
6-8 weeks |
Battery |
2pcs |
♦ GB/T 36276
● Applicable Scope
Lithium-ion cells, modules and clusters used for electrical energy storage system
● Sample size and lead time
Product |
Sample Size |
Test Lead Time |
Cell |
33 |
32-35 weeks |
Module |
11 |
32-35 weeks |
Cluster |
1 |
2-3 weeks |
♦ EU EESS battery requirements (CE certification - EU New Batteries Regulation
● Applicable Scope
The new EU batteries regulation divides industrial batteries into two categories, as follows:
Industrial batteries: weight > 5kg, traction batteries for industrial transport vehicles (such as: railways, mechanical equipment, forklifts), communication infrastructure batteries, household energy storage batteries, etc.
Stationary BESS system: an industrial battery with internal storage that is specifically
designed to store from and deliver electric energy to the grid or store for and deliver electric energy to end-users.
●Scope
Article |
Requirements |
Remark |
|
Article 6 |
Restriction on Substances
(Annex I) |
Content of lead, cadmium, mercury
|
/ |
REACH Annex XVII
|
/ |
||
Article 10 |
Performance and durability requirements
|
1) Rated capacity (Ah) and capacity fade (%) 2) Power (W) and power fade (%) 3) Internal resistance (Ω) and internal resistance increase (%) 4) If applicable, energy round-trip efficiency and its fade (%) 5) Expected life-time The attached documents include the above performance and durability parameter values. |
/ |
Article 12 |
Safety of stationary BESS
|
Meet the following tests: 1) Thermal shock and cycling (battery system) 2) External short circuit protection (cells and systems) 3) Overcharge protection (battery system) 4) Over-discharge protection (battery system) 5) Overtemperature protection (battery system) 6) Thermal propagation protection (battery system) 7) Mechanical damage by external forces (impact + fall) 8) Internal short circuit (cell) 9) Thermal abuse (cell) 10) Fire test (battery system) 11)Emission of gases (cells and systems) |
Apply to stationary EESS battery
|
Article 13 |
Labelling and markings of batteries |
Meet the requirments of seporate collection symbol, label, and CE requirements
|
|
Article 14 |
The state of health and expected lifetime of battery
|
BMS displays information such as the number of charge and discharge cycles; Documentation is required to demonstrate the basic information and functionality of the BMS (or may be included in the specification) Verify that the BMS contains the above parameters |
Apply to stationary BESS
|
Article 15-20 |
Conformity assessment requirements |
CE marking + Declaration of conformity DoC |
|
Article 47-53 |
Due diligence
(For companies with annual sales of more than 40 million euros) |
Companies are required to conduct supply chain due diligence on raw materials.
|
Effective from 2025.8.18 |
Article 54-76 |
Waste battery management
|
Enterprises need to complete registration with the competent authorities in each country, and bear the extended producer responsibility system.
|
Effective from 2025.8.18
|
♦ North America ESS Certification
● Introduction
The installation and usage of ESS in North America should comply with local laws and regulations from American fire department. The requirements cover aspects of design, test, certification, fire fight, environment protection and so on. As a critical component of ESS, lithium-ion battery system should comply with following standards.
● Standard Applicable Scope
Standard Number |
Standard Name |
Introduction |
UL 9540 |
Energy Storage Systems and Equipment |
Evaluate the compatibility and safety of different components (like power converter, battery system, etc.) |
UL 9540A |
Standard for Test Method for Evaluating Thermal Runaway Fire Propagation in Battery Energy Storage Systems |
This is the requirement for thermal runaway and propagation. It aims to prevent ESS causing fire hazard. |
UL 1973 |
Batteries for use In Stationary Applications and Motive Auxiliary Power Applications |
Regulates battery systems and cells for stationary appliances (like photovoltaic, wind turbine storage and UPS), LER and stationary railway appliance (like railway transformer). |
●Samples
Standard |
Cell |
Module |
Unit (rack) |
Energy storage system |
UL 9540A |
10pcs |
2pcs |
Check before project start |
— |
UL 1973 |
14pcs或20pcs 14pcs or 20pcs |
— |
Check before project start |
— |
UL 9540 |
— |
— |
— |
Check before project start |
● Lead Time
Standard |
Cell |
Module |
Unit (Rack) |
ESS |
UL 9540A |
2 to 3 months |
2 to 3 months |
2 to 3 months |
— |
UL 1973 |
6 to 8 weeks |
— |
2 to 3 months |
— |
UL 9540 |
— |
— |
— |
2 to 3 months |
▍Test Consignment
Consignment Test Items List |
|||
Test Item |
Cell/Module |
Pack |
|
Electric Performance |
Capacity at normal, high and low temperature |
√ |
√ |
Cycle at normal, high and low temperature |
√ |
√ |
|
AC, DC internal resistance |
√ |
√ |
|
Normal, high temperature storage |
√ |
√ |
|
Safety |
Thermal abuse (stage heating) |
√ |
N/A |
Overcharge (protection) |
√ |
√ |
|
Overdischarge (protection) |
√ |
√ |
|
Short circuit (protection) |
√ |
√ |
|
Overtemperature protection |
N/A |
√ |
|
Over loadprotection |
N/A |
√ |
|
Penetration |
√ |
N/A |
|
Crush |
√ |
√ |
|
Rollover |
√ |
√ |
|
Salt water sink |
√ |
√ |
|
Forced internal short circuit |
√ |
N/A |
|
Thermal runaway (propagation) |
√ |
√ |
|
Environment |
Low voltage at high and low temperature |
√ |
√ |
Thermal shock |
√ |
√ |
|
Thermal cycle |
√ |
√ |
|
Salt Spray |
√ |
√ |
|
IPX9k, IP56X, IPX7, etc. |
N/A |
√ |
|
Mechanical shock |
√ |
√ |
|
Electromagnetic vibration |
√ |
√ |
|
Humidity and thermal cycle |
√ |
√ |
|
Tips: 1. N/A means not applicable; 2. The table above does not cover all the services we can provide. If you require other testing items, you may contact our sales and customer services. |
▍MCM Advantage
● High accuracy and high range equipment
▷ Our equipment accuracy reaches ±0.05%. We can charge and discharge cells of 4000A, 100V/400A modules and 1500V/500A packs.
▷ We have 12m3 walking in constant temperature and constant humidity chamber, 12m3 walking in compound salt spray chamber, 10m3 high and low temperature low pressure that can charge and discharge simultaneously, 12m3 walking in dust proof equipment and IPX9K, IPX6K water proof equipment.
▷ Displacement accuracy of penetration & crush equipment reaches 0.05mm. There are also 20t electromagnetic vibration bench 20000A short circuit equipment.
▷ We have cell thermal runaway test can, which also has the functions of gas collection and analysis. We also have place and equipment for thermal propagation test for battery modules and packs.
● Global services and multi solutions:
▷ We provide systematic certification solution to help customers get into market quickly.
▷ We have cooperation with test and certification organizations of different countries. We can provide multiple solutions for you.
▷ We can provide technical support from product design to certification.
▷ We can manage different certification projects at the same time, by which we can help you save your samples, lead time and fee cost.